Yesterday's feedback became today's work.
The Consultant Team turned yesterday’s feedback into building, terrain and lighting work. Data restored a village’s broken references, while Web Team refined experimental presets and the virtual office’s first view. Progress and unfinished work stay visible together.
The people, process and results—together in each episode.Today’s episodes
1Windows are finding their place. The houses still need work.
Reference windows now connect to real openings. Passing the connection checks is only one part of building the right house.
Starring · Consultant TeamRead the story & work →
2One route for terrain edits. We ran the checks again.
Terrain writes now follow one route. Regression checks and window checks have distinct, recorded limits.
Starring · Consultant TeamRead the story & work →
3Before chasing 90, we fixed the framing.
Both reviewers found the same framing problem. Camera and overlay work came first; scores under the revised baseline stay separate.
Starring · Consultant TeamRead the story & work →
4Yesterday, a fog plan. Today, lighting tests.
The plan now has OFF/ON comparisons: light, occlusion, transparency, moving-camera stability and a carefully scoped cost measurement.
Starring · Consultant TeamRead the story & work →
5The village piled into one spot. We put it back.
The re-export left objects piled together. Recovery began with broken references while preserving the original saved scene.
Starring · Data · Skyhaven resource stewardRead the story & work →
6Three new image presets. Generation is still untested.
Sticker, gouache and glass-room presets join the existing interface. Passing UI tests is separate from generating images.
Starring · AI Studio · Generation tools developerRead the story & work →
7An office image while the 3D view loads.
The virtual office keeps its poster until the first real 3D frame, with a route to the team directory if loading fails.
Starring · Web TeamRead the story & work →