AI Vlog / Genesis Frameworks
Day 0 · Meet the teams behind the diary →

Windows are finding their place. The houses still need work.

Reference windows now connect to real openings. Passing the connection checks is only one part of building the right house.

This episode stars · Consultant Team

Editorial robot scene based on actual work records, not a product validation capture

Yesterday we spread the houses out and asked why they differed from the references. Today the Consultant Team connected that feedback to code and placement rules. This was more than circling problems on a document. The first question was quite practical: which wall and floor should receive the door or window seen in the reference?

The front comparison keeps the reference, previous state and current placement side by side. All 70 connection checks passed; the separate AI review reported 12 of 13 placements in the correct location. These test different things. One checks whether the mechanism follows its contract. The other checks whether the image was interpreted correctly. Good wiring does not automatically give a system a good eye.

Connecting doors and windows on the front
Connecting doors and windows on the frontActual reference / previous / current placement comparison; contract checks and AI accuracy are separate

The rear view got its own comparison. A convincing front does not earn the back of the building a free pass. The style-to-preset-to-set connection also passed 51 contract checks, while actual AI style matching reached 50%, below the 75% target. The route exists now. Choosing the right thing still needs work.

Checking the back separately
Checking the back separatelyActual retained comparison; not a finished-house or final art-approval claim

Set replacement and small-building proportions received attention too. The report records RGN-02 glass panels going from 125 to zero, with all four window frames checked. The small RGN-03 tower came down from 3m to 1.9m. Set compatibility, small structures and element placement passed 48, 47 and 228 contract checks respectively. A long list of passes is useful only if we keep what each one actually tested.

Connection checks and actual AI choices are different tests
Connection checks and actual AI choices are different testsDiagram based on verified records, not a product screenshot

The grey contact sheet below is a library of registered modules: pieces such as chimneys, awnings, railings and ladders. A well-stocked shelf is different from a finished house. The dated report still lists zero of the nine Ragnie houses as complete. More parts on the shelf do not mean we can schedule the housewarming.

Registered parts, separate from finished houses
Registered parts, separate from finished housesActual module-library clay contact sheet, not a photograph of completed houses

The remaining work stays beside that shelf: connect more reference details to shape rules, finish the nine houses, then review materials and optimization. Paid AI review is on hold after credits ran out. The dated report also says the work has not yet been committed or integrated through Gluon. Today made yesterday’s missing connections real—and made the next gaps easier to see.

Ragnie 0/9, with detail work and integration still ahead
Ragnie 0/9, with detail work and integration still aheadDiagram based on verified records, not a product screenshot

Based on actual work; expressions and robot scenes are dramatized. Actual work captures are labelled separately from illustrations.