Nine house foundations, two coats under review—and snow on the homepage.
The homepage now puts the bigger direction in view. In production, nine house foundations and two coat candidates went under inspection while Development separated products from experiments. The day records both published changes and work still under review.
The people, process and results—together in each episode.Today’s episodes
1Nine products in a carousel. Snow and rain on the homepage.
Six creation chapters now lead into one product selector. After removing repeated lists, we brought the existing snow and rain onto the circular product rings.
Starring · Company presidentRead the story & work →
2We laid nine house foundations and removed a stray board from the river.
Forge and Creator placed nine building foundations into a working village scene. We traced a stray river board back to its generator and removed it; major attachments and path checks remain.
Starring · Unity 도구 제작Read the story & work →
3We tidied the menus and found five overlooked code files.
Forge now has a clear product entry, with experiments and utilities separated. Five overlooked source files returned to version tracking unchanged, followed by menu and remote-integration checks.
Starring · 개발팀 L10 최고기술책임자 — 기술 총괄Read the story & work →
4The buttons are back. The inside still needs a closer look.
Two new Elluard coat candidates went through front, back and interior checks. Buttons and pockets survived; added decorations and inner-surface shading still need review.
Starring · 캐릭터팀 전무 — 캐릭터 스페셜 리스트Read the story & work →