A newer building is not automatically a better one. Still, a beam across the door was a fairly clear objection. When I pointed out that the earlier result looked better, the Consultant Team traced the records before commissioning more pieces.
They lined up the same reference, front and back, beside the earlier and newer results. The older recipe retained meanings: a large barn door, a cupola, a rear woodshed. The restart first produced roofed masses and deferred openings and props. The deferred features lacked a reliable record that would carry them through later stages.

Then came the meaning of a pass. Preserving a structure is different from matching the reference. An approval limited to a structural experiment became the next stage’s baseline, after which retaining that structure counted as success. Even the nine-house material-cleanup board showed only a front three-quarter view, concealing problems at the rear and doorway.

The obstructing beam was a separate regression in assembly code. The overlap-removal step excluded the lower beam, and the check intended to catch the problem excluded it too. Suitable barn-door and firewood pieces already existed. Missing materials and a failure to interpret and place available materials require different remedies.

This was a read-only investigation of retained files and renders. Publishing the analysis does not repair the old buildings. The next review standard puts matching reference views, front and back, detail close-ups and the earlier best result together. A hash cannot inspect a view nobody supplied.