After the investigation, I chose a fresh start for Forge 2. This was not a new name pasted over deleted work. The old Forge stays while a separate implementation, without references to its code, proves a smaller core.
The first subject was a wall with a door. Across different wall lengths, the team compared repeating or stretching fixed beams with generating members that stop at openings. In 66 Unity cases, repeated pieces crossed doors or left gaps. The method that knew the opening and generated the required lengths had no failures in that test.

Stretching an entire door made its hinges grow too. That helped separate variable-length walls and beams from doors and windows whose shapes must stay intact. The final M1 direction selects handmade opening pieces in fixed size steps without stretching them. The decision record was updated so the earlier procedural-plank experiment would not be mistaken for the final production method.

Six retained attachments were converted to the new material-ID approach and checked for unchanged geometry and bounds. Palette differences, including glass colour, remain recorded. Surface-shader experiments ran separately; a small result on one PC does not establish mobile performance.

The M1 core then turns one rectangle into a base, walls, timber and roof. Clicking a door or window cuts the members at that opening. The checks inspect the generated geometry itself, including whether it crosses a door. They also fail a deliberately broken version that leaves the beam in place. Green checks are more useful when they can reject the wrong house.

The record includes 1,000 size variations, save-and-reopen behaviour, Undo, and matching UI operations reproduced through commands. All seven M1 criteria passed in the retained results. Slow drag outliers remain, however, and hands-on mouse use is untested. Doors and windows still use placeholder frames; a final reference-matching house is not complete.

These tests finished early on November 12 UTC, still the evening of November 11 in New York. Later interface and roof work is not pulled back into this diary date. What opened today is a new workbench that checks the doorway before announcing a house factory.

