A bridge looks simple on a map: water underneath, people over the top. Once the causeway was opened and the bridge placed, however, the road still had to reach the village. Ending construction at the far end of the bridge would make for an awkward address.
Working in a copy of the 256-metre coast, the map specialist connected the waterway and placed a 17.1-metre timber gatehouse bridge with a short road. Matching-camera boards show water beneath it. They also expose a rectangular shallow patch and unwanted height changes in two nearby steep slopes.

The team did not hand-patch the terrain and call the tool fixed. The road and river specialist corrected the slope influence and added the needed commands. Only then did the map specialist continue. The handoff is evidenced by the next stage consuming the fix, rather than merely receiving a completion message.

The inner strait now reaches a 2.5-metre centre depth with a gentler approach from shore. The bridge stays while a dirt road extends toward the village site. The total route is 105 metres, and terrain inside the three house sites remains unchanged. The rectangular shallow patch is gone; the path is still darker brown than the reference.

Buildings and individual house approaches were outside this pass. Path colour, sand rules and water appearance remain for review, and the work is not checked in. Later building placement was paused for user review, so this is not a completed village. Today produced the route to the houses, rather than the housewarming.