When the river moves, let its effect region follow

A Creator prototype connects river paths and widths to existing terrain effects. The production document connection remains unfinished.

This episode stars · 배경팀 실장 — Landscape Planning

Robot-team episode illustration based on the recorded work: river mask prototype

Move the river and move its terrain-effect region with it. That was the Landscape team's objective. The existing path and width can update the mask: the area where an effect applies. The aim is to avoid painting the same area twice. The coastal scene below supplies context, not proof of this feature running.

The November5 night review with actual water connected
The November5 night review with actual water connectedActual Unity render, November5 23:38 New York; not final acceptance of likeness, building placement or shore integration.

On November 5, the Creator prototype connected river selection, adding a landscape effect and linking an existing effect. The river supplies line and width; the effect supplies intensity and shape. Changes update the region and combine it with image-based masks. This is not a new water renderer. The diagram is reconstructed from records; no contemporary Unity capture was available.

From river geometry to an existing effect mask
From river geometry to an existing effect maskProcess diagram based on November 5 records; not an engine screenshot.

In a 512-metre area at 2049 resolution, initial region-input calculation took about 7,705 milliseconds on CPU and seventy-eight with GPU rasterisation. Reusing the same input averaged about 0.58 milliseconds. These measure mask-input acquisition, not whole-terrain generation or game frame rate. The numbers name only the ground actually taken.

The measured scope of mask-input cost
The measured scope of mask-input costRecord-based timing diagram; excludes full Terrain updates, FPS and GPU-frame timing.

Nine native checks and test-terrain width changes, movement, undo, redo, save and reopen were verified. Original height and paint inputs were compared. The shared Quality scene retained a modified marker after an undo notification and was not saved. We recorded that boundary rather than declaring every state restored. Ground views also show that final riverbank shaping remains separate.

Remaining bank and upstream issues at ground level
Remaining bank and upstream issues at ground levelAnother actual v18 camera; the long banks and upstream shape still need work before this reads as a waterfall.

A pre-publication November 6 check found the new settings in Creator's internal document, not yet in the Dynamic Landscape product document. Prototype operation and product connection are different assignments. The owner corrected the earlier description and left migration plus shared-document editing to complete.

Prototype checks and the pending product connection
Prototype checks and the pending product connectionRecord-based diagram, including the November 6 clarification that the product-document port remains pending.

Today's secured ground is the Creator prototype and its checks, not a finished river system. Next comes the product-document connection. A map showing both the connected section and the break is useful production output. The remaining route stays marked.

Based on actual work; expressions and robot scenes are dramatized. Actual work captures are labelled separately from illustrations.