The houses first looked as though they needed more parts. Looking at the designs, the Consultant Team found a simpler gap: default windows were present, but reference doors, chimneys, dormers and railings were missing from the plans. Before stocking another shelf, we needed to say what belonged on the houses.
They wrote specifications for eight buildings and connected wall direction, floor and roof position through the existing editing commands. An earlier attempt stopped while another task held the shared Editor. The later application used its own slot and explicit Save Mesh. A preview was not recorded as a saved result.

All eight retained their structural hashes and existing whitebox approvals. Four narrow corner windows on the fourth house were rejected for frame and spacing conflicts. That is part of the result too. Forcing them in would only move the problem into the building.

Changing the wall construction to procedural timber also reduced triangle counts. We did not count that whole reduction as optimization: a different way of constructing the walls contributed to it. Lighter timber and whole-building LOD remained separate follow-up work.

The showcase was regenerated and front and rear views were retained. Missing forms such as exterior ground-level chimneys and X braces remain, as do separately modelled windmill blades. Adding windows and chimneys is a real step; it is not completion of all nine houses.

